Key facts
What the official sources publish
Every value belongs to this exact product. Expand any fact to inspect its official evidence in place.
Eligible customerListed individuals and legal entities, for existing-business solar use; both new and existing borrowers. Valid Udyam for MSMEs; GST where applicable; DISCOM/CEIG/site approval and net metering are required.View source
All entity types, existing/new borrower scope, Udyam condition and grid/net-metering/site approval are retained.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Eligibility (a)–(c)
- Accessed
- 8 Oct 2026
- Confidence
- high
Facility amountNo minimum loan amount; maximum is need-based.View source
The scheme expressly states no minimum and a need-based maximum; no numeric cap is added.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Loan Amount
- Accessed
- 8 Oct 2026
- Confidence
- high
RepaymentMaximum 10 years including a moratorium period; the scheme sheet does not state a separate maximum moratorium length.View source
The printed row gives maximum 10 years including moratorium and does not quantify the moratorium separately.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Tenure of Loan
- Accessed
- 8 Oct 2026
- Confidence
- high
CollateralAt least 30% collateral in immovable property or bank-approved liquid security; alternatively the facility may be covered by CGTMSE/ CGSSI under bank policy or by the CGTMSE Hybrid Security model.View source
The sheet presents three alternatives; guarantee coverage is subject to the bank's policy guidelines.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Collateral Security
- Accessed
- 8 Oct 2026
- Confidence
- high
Applicable charges50% concession on applicable charges; no rupee amount or base charge is stated in the scheme sheet.View source
Publish the stated 50% concession without inventing a base fee or rupee amount.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Upfront Fee
- Accessed
- 8 Oct 2026
- Confidence
- high
DocumentsPNB links a conditional 25-item general MSME checklist for MSME applicants; the checklist is not Solar Energy-specific or exhaustive. PNB's commercial-loan FAQ says a case-specific checklist accompanies the application.View source
The checklist includes entity/owner, registration, financial, existing-bank, project and security records, with applicability conditions shown in its complete table. PNB's says the scheme/application-specific list accompanies the form.
- Source
- PNB Banking catalogue and linked general checklist
- Page / section
- Banking, scheme link and Application Forms/Checklist; checklist pp.1–2, items 1–25
- Accessed
- 8 Oct 2026
- Confidence
- high
MSME credit-decision timelineFor MSME applications, PNB states a credit-decision timeline not exceeding 14 working days for limits up to ₹25 lakh and 6 weeks for limits above ₹25 lakh. This is not a sanction or disbursement guarantee.View source
The says the timelines are mandated under the direction; Solar Energy also has a non- route, so this fact is expressly limited to applications.
- Source
- PNB Frequently Asked Questions — Commercial Loans
- Page / section
- Commercial Loans , What is the time frame for sanctioning Commercial Loans?; table: Credit Limit / Time limit not exceeding
- Accessed
- 8 Oct 2026
- Confidence
- high
Average debt-service coverAverage DSCR must be at least 1.25.View source
PNB labels 1.25 as the minimum average ; it is retained as a financial eligibility/assessment ratio, not an interest rate.
- Source
- PNB Solar Energy Scheme
- Page / section
- page 1, Benchmark Ratio
- Accessed
- 8 Oct 2026
- Confidence
- high
Benefits and features
- Term loan for fixed assets; off-season excess electricity may be sold through the grid.
- 50% concession on applicable charges.
Eligibility
- Existing and new borrowers are eligible. The listed constitution types include individuals, proprietorships, partnerships, , private/public limited companies, trusts, societies, co-operative societies and other legal entities with registration where applicable; valid Udyam is required for units.
- The solar unit must be grid-connected and have net-metering/site-feasibility approval from the jurisdictional DISCOM, CEIG or other competent authority.
- Average must be at least 1.25.
Passing a listed condition does not mean the bank will approve an application.
Documents the bank lists
- For applicants, see PNB's linked 25-item general checklist; items are conditional on entity and facility and it is not Solar Energy-specific or exhaustive. PNB's Commercial Loans says a loan-specific checklist accompanies the application form.