Key facts
What the official sources publish
Every value belongs to this exact product. Expand any fact to inspect its official evidence in place.
PurposeInstallation of an eligible residential solar rooftop system, including qualifying elevated ground-mounted installation where the applicant has land rightsView source
The installation must satisfy current MNRE technical and roof-area requirements.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features and — eligibility
- Accessed
- 13 Aug 2026
- Confidence
- high
Published loan rangeNo published minimum; up to ₹2 lakh under the lower tier and above ₹2 lakh up to ₹6 lakh under the higher tierView source
Actual finance is limited by project cost, margin, feasibility and underwriting.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Loan Amount and
- Accessed
- 13 Aug 2026
- Confidence
- high
Current published rate tiers5.75% p.a. up to ₹2 lakh, equal to EBLR minus 2.15%; 7.90% p.a. above ₹2 lakh and up to ₹6 lakh, equal to EBLREffective 15 Dec 2025View source
The live card and sustainability report supersede the product older 6.00% and 8.15% figures dated 15 June 2025.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Current Interest Rates card; FY2025-26 Sustainability Report
- Accessed
- 13 Aug 2026
- Confidence
- high
Minimum borrower margin10% of project cost for both published loan tiersView source
Loan proceeds plus the borrower margin are paid directly to the approved vendor or contractor after required feasibility reports.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Margin
- Accessed
- 13 Aug 2026
- Confidence
- high
Maximum repayment period120 months including a six-month moratorium; no published minimum period and no prepayment penaltyView source
Age-at-completion rules can shorten the available term.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Tenor and Moratorium
- Accessed
- 13 Aug 2026
- Confidence
- high
Age, credit and income tiersSingle applicants up to age 65 with closure before 70; joint route up to age 75 subject to co-borrower closure rule; no minimum CIBIL or income up to ₹2 lakh, while the higher tier needs CIBIL 650+ and net annual income of at least ₹3 lakhView source
Applicants with a default or write-off are excluded even where no minimum score is prescribed.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Age and Other Eligibility Conditions
- Accessed
- 13 Aug 2026
- Confidence
- high
Processing and prepayment chargesNil processing fee and no prepayment penaltyView source
Insurance cost is borne by the customer where insurance is mandatory for the higher tier.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features and
- Accessed
- 13 Aug 2026
- Confidence
- high
Published central subsidy₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW; the borrower claims it through PM Surya Ghar using the loan account numberView source
Subsidy eligibility and payment are governed by the government portal, not guaranteed by loan sanction.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Subsidy
- Accessed
- 13 Aug 2026
- Confidence
- high
Application routeRegister first at PM Surya Ghar, then apply through JanSamarth using either self-service or assisted journeyView source
The bank page states all applications are first registered with Surya Ghar and then sourced through JanSamarth.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Other Covenants and Link for loan application
- Accessed
- 13 Aug 2026
- Confidence
- high
FY2025-26 programme evidenceSBI reports a 67% market share in financing residential rooftop-solar installations under PM Surya Ghar and ₹13,721 crore of sanctioned limits as at 31 March 2026. During the year it liberalised sourcing, processing and sanctioning and allowed technically compliant elevated ground-mounted installations where the customer holds rights to the land.Effective 31 Mar 2026View source
All product-specific facts in the Surya Ghar case study are retained; unrelated institutional ESG disclosures across the remaining report pages were reviewed but not attached as consumer-product facts.
- Source
- Sustainability Report 2025-26 — Surya Ghar
- Page / section
- Report pages 40-42 — Green and Sustainable Products / Surya Ghar
- Accessed
- 13 Aug 2026
- Confidence
- high
Reported concessional ratesThe report states EBLR less 2.15 percentage points, effective 5.75%, for loans up to ₹2 lakh; and EBLR, stated as 7.90%, for loans above ₹2 lakh and up to ₹6 lakh.Effective 31 Mar 2026View source
Both tiers, benchmarks, spread and effective rates are retained as report-dated evidence; the live rate page remains controlling for current comparison values.
- Source
- Sustainability Report 2025-26 — Surya Ghar
- Page / section
- Report pages 40-41 — Initiatives to Popularise Green Finance
- Accessed
- 13 Aug 2026
- Confidence
- high
Prepayment / foreclosureNo prepayment penalty.View source
The manually reviewed product record states: “No prepayment penalty”. The issuer's current sanction terms should still be confirmed before applying.
- Source
- Surya Ghar Rooftop Solar Loan — official product page
- Page / section
- Fees and prepayment
- Accessed
- 13 Aug 2026
- Confidence
- high
Tenure120 months including a six-month moratorium; no published minimum period and no prepayment penaltyView source
Age-at-completion rules can shorten the available term. This is the issuer-published maximumTenure value shown under the comparison field “Tenure”.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Features — Tenor and Moratorium — comparison field: Tenure
- Accessed
- 13 Aug 2026
- Confidence
- high
Loan typeRooftop solar installation loanView source
official page titles this product Surya Ghar — Loan for Solar Roof Top and identifies it as a personal-finance loan for rooftop solar installations.
- Source
- Surya Ghar — Loan for Solar Roof Top
- Page / section
- Product title and Personal Finance Loans navigation
- Accessed
- 29 Aug 2026
- Confidence
- high
Maximum amountLoan up to ₹6 lakhView source
The manually reviewed product summary states: “Loan up to ₹6 lakh”.
- Source
- Surya Ghar Rooftop Solar Loan — official product page
- Page / section
- Published loan terms in product summary
- Accessed
- 13 Aug 2026
- Confidence
- high
BenchmarkEBLR minus 2View source
The manually reviewed product record states: “5.75% p.a. up to ₹2 lakh, equal to minus 2.15%; 7.90% p.a. above ₹2 lakh and up to ₹6 lakh, equal to ”.
- Source
- Surya Ghar Rooftop Solar Loan — official product page
- Page / section
- Published product metadata
- Accessed
- 13 Aug 2026
- Confidence
- high
Minimum incomeThe higher tier requires PAN, CIBIL 650+, annual income of ₹3 lakh or more and fuller income documents.View source
The manually reviewed product record states: “Single applicants up to age 65 with closure before 70; joint route up to age 75 subject to co-borrower closure rule; no minimum or income up to ₹2 lakh, while the higher tier needs CIBIL 650+ and net annual income of at least ₹3 lakh”.
- Source
- Surya Ghar Rooftop Solar Loan — official product page
- Page / section
- Published product metadata
- Accessed
- 13 Aug 2026
- Confidence
- high
Benefits and features
- Loan up to ₹6 lakh
- Current floating rates from 5.75% p.a.
- Ten-year maximum repayment
- Nil processing fee
- No prepayment penalty
- Published government-subsidy pathway
Eligibility
- The applicant needs eligible roof or land rights, sufficient installation area, an electricity bill and an savings account.
- The higher tier requires , CIBIL 650+, annual income of ₹3 lakh or more and fuller income documents.
- Default or write-off credit histories are excluded.
- Insurance is not mandatory for 1–3 kW capacity but is required above 3 kW, at customer cost.
- Government subsidy is separately administered and not guaranteed by .
Passing a listed condition does not mean the bank will approve an application.
Documents the bank lists
- and electricity-bill details
- for the higher tier
- Two years of Form 16 or income-tax returns for the higher tier
- Six months' salary statement or applicable bank and income evidence for the higher tier
- MNRE-mandated feasibility reports and vendor documentation